Manvi and Darshan together can complete a project work in 40 days. They worked together for 25 days and then Darshan left. After another 24 days, Manv
Question

Manvi and Darshan together can complete a project work in 40 days. They worked together for 25 days and then Darshan left. After another 24 days, Manvi completed the remaining project work. In how many days can Manvi alone complete the project?

A.

54

B.

40

C.

50

D.

64

Correct option is D

Given:
Manvi and Darshan together can complete the project in 40 days.
They worked together for 25 days, and then Darshan left.
After Darshan left, Manvi completed the remaining work in 24 days.

Formula Used:

Work done per day=1Total time taken together\text{Work done per day} = \frac{1}{\text{Total time taken together}}

Work done=Work done per day×Number of days\text{Work done} = \text{Work done per day} \times \text{Number of days}​​

Solution:
Let, Total work = 1 unit
Work done by Manvi and Darshan together in 1 day = 140\frac{1}{40}​  units
Work done by Manvi and Darshan in 25 days:

Work done=25×140=2540=58 units\text{Work done} = 25 \times \frac{1}{40} = \frac{25}{40} = \frac{5}{8} \text{ units}

Remaining work=158=38 units\text{Remaining work} = 1 - \frac{5}{8} = \frac{3}{8} \text{ units}

Let Manvi's work rate be 1M\frac{1}{M} ​ units per day, where M  is the number of days Manvi takes to complete the work alone.

Work done by Manvi in 24 days:

24×1M=24M units24 \times \frac{1}{M} = \frac{24}{M} \text{ units}

So,   24M=38\frac{24}{M} = \frac{3}{8}

M=24×83=64 daysM = \frac{24 \times 8}{3} = 64 \text{ days}

Option (D) is right.

Free Tests

Free
Must Attempt

CBT-1 Full Mock Test 1

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

CBT-1 General Awareness Section Test 1

languageIcon English
  • pdpQsnIcon40 Questions
  • pdpsheetsIcon30 Marks
  • timerIcon25 Mins
languageIcon English

Similar Questions

test-prime-package

Access ‘RRB NTPC’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
353k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow