Correct option is A
Given:
Nirbhay can do the work in 19 days
Vismay can do the work in 6 days
Nirbhay leaves 4 days before the work is completed
Solution:
Let the total number of days the work takes be = D
LCM of total work to simplify the distribution of work. Assume total work = LCM of 19 and 6 = 114 units
Then, work per day:
Nirbhay = 114 ÷ 19 = 6 units/day
Vismay = 114 ÷ 6 = 19 units/day
Then Nirbhay works for (D − 4) days, and Vismay works for D days
Total work done = Nirbhay’s work + Vismay’s work
114 = 6(D - 4) + 19D
114 = 6D - 24 + 19D = 25D - 24
25D = 138
D =