Correct option is B
Given:
Time taken by
x and y = 16 days
y and z = 24 days
x,y and z = 12 days
Solution:
The work rate
x+y=161 ----- (1)
y+z=241 ----- (2)
x+y+z=121 ----- (3)
Substitute equation (1) in (3)
161+z=121
z=121−161
z=1924=481
Substitute equation (2) in (3)
x+241=121
x=121−241
x=28812=241
the combined work rate of x and z
x+z=241+481=483=161
Therefore, time taken by x andz is 16 days