arrow
arrow
arrow
A can do a work in 12 days and B can do the same work in 18 days. If they work on it together for 4 days, then what fraction of the work is left?
Question

A can do a work in 12 days and B can do the same work in 18 days. If they work on it together for 4 days, then what fraction of the work is left?

A.

4/9

B.

11/9

C.

14/9

D.

13/9

Correct option is A

Given:

A completes the work in 12 days

B completes the work in 18 days

Both work together for 4 days

Find: Fraction of work left

Method required: LCM method

Formula Used:

Work rate = Total work ÷ time

Work done = (Rate of A + Rate of B) × Time worked

Solution:

Total work = LCM(12, 18) = 36 units

A’s 1-day work = 3612 \frac{36}{12} = 3 units

B’s 1-day work = 3618\frac{36}{18} = 2 units

Combined 1-day work = 3 + 2 = 5 units

Work done in 4 days = 5 × 4 = 20 units

Work left = 36 − 20 = 16 units

Fraction of work left = 1636 \frac{16}{36}​ = 49\frac49​​

Free Tests

Free
Must Attempt

CBT-1 Full Mock Test 1

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

CBT-1 General Awareness Section Test 1

languageIcon English
  • pdpQsnIcon40 Questions
  • pdpsheetsIcon30 Marks
  • timerIcon25 Mins
languageIcon English

Similar Questions

test-prime-package

Access ‘RRB NTPC UG CBT-1’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
354k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow