Correct option is D
Let the efficiency of B be 10x units/day
Efficiency of A = 120/100×10x =12x units/day
Efficiency of C = 5/6×12x =10x units/day
Total work = (10x+12x+10x)×90 = 32x × 90 units
Required time = 5/9×(32x × 90)/(10x+10x)=80 days