Correct option is C
Given:
A can finish work in 8 days
B can finish work in 16 days
C can finish work in 24 days
Total work required = 11 times the original work
Need: Time if A, B, and C work together
Concept Used:
Work rate =
Time for work =
Solution:
A’s 1-day work =
B’s 1-day work =
C’s 1-day work =
Combined 1-day work
So, together they finish of work per day.
Time to complete 1 work = days
Time to complete 11 works = 48 days
Alternate Method :
Take LCM of 8, 16, 24 = 48 units (assume total work = 48 units).
Work done per day:
A = 48 ÷ 8 = 6 units/day
B = 48 ÷ 16 = 3 units/day
C = 48 ÷ 24 = 2 units/day
Together per day = 6 + 3 + 2 = 11 units/day
Time for 1 work (48 units) =
Time for 11 works (11 × 48 = 528 units):