A and B can do a piece of work in 18 days, B and C can do the same work in 32 days and A and C can do the same in 52 days. The time taken by A, B and
Question

A and B can do a piece of work in 18 days, B and C can do the same work in 32 days and A and C can do the same in 52 days. The time taken by A, B and C together to do the work is:

A.

18342397\frac{342}{397}​ days

B.

17341397 \frac{341}{397}​ days

C.

15339397\frac{ 339}{397}​ days

D.

16340397\frac{ 340}{397}​ days

Correct option is A

Given:

A + B = 18 days

B + C = 32 days

A + C = 52 days

Formula Used:  

Total Work = Efficiency × Time

Solution:

Total work = LCM(18, 32, 52) = 3744 units

Efficiency;

A + B =374418 \frac{3744}{18}​ = 208 units/day

B + C = 374432\frac{3744}{32} ​= 117 units/day

A + C = 374452\frac{3744}{52}​ =  72 units/day

Now, 

(A + B) + (B + C) + (A + C) = 2(A + B + C) = 208 + 117 + 72

A + B + C = 3972 \frac{397}{2}​ units/day

Time for all three together = 3744397/2\frac{3744}{397/2}​​

=3744×2397 \frac{3744 \times 2}{397}​​

=7488397 \frac{7488}{397}​​

=18342397 18\frac{342}{397} ​days

Free Tests

Free
Must Attempt

BSSC Inter Level Pre PYP (Held on 5th Feb 2017)

languageIcon English
  • pdpQsnIcon150 Questions
  • pdpsheetsIcon600 Marks
  • timerIcon135 Mins
languageIcon English
Free
Must Attempt

BSSC Inter Level Full Mock Test 01

languageIcon English
  • pdpQsnIcon150 Questions
  • pdpsheetsIcon600 Marks
  • timerIcon135 Mins
languageIcon English
Free
Must Attempt

Parts & Schedules of Constitution

languageIcon English
  • pdpQsnIcon10 Questions
  • pdpsheetsIcon10 Marks
  • timerIcon5 Mins
languageIcon English
test-prime-package

Access ‘SSC GD’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
243k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow