Correct option is A
Given:
Sara can finish the work in 18 days.
Tara can finish the work in 15 days.
Tara worked for 10 days and then left.
Formula Used:
Work done by a person in 1 day = 1 / (number of days required to complete the work)
Total work done = Work rate × Time
Solution:
Calculate the work done by Tara in 10 days:
Work rate of Tara = 1 / 15
Work done by Tara in 10 days = (1 / 15) × 10 = 10 / 15 = 2 / 3
Calculate the remaining work:
Total work = 1
Remaining work = 1 - (2 / 3) = 1 / 3
Calculate the time taken by Sara to complete the remaining work:
Work rate of Sara = 1 / 18
Time taken by Sara to complete the remaining work = (Remaining work) / (Work rate of Sara)
Time = (1 / 3) / (1 / 18) = (1 / 3) × 18 = 6 days
Answer: 6
Alternate Method: