    A can lay railway track between two given stations in 22 days and B can do the same job in 11 days. With the help of C, they did the job in 5 days onl
    Question

    A can lay railway track between two given stations in 22 days and B can do the same job in 11 days. With the help of C, they did the job in 5 days only. Then, C alone can do the job in

    A.

    15 57\frac57 days​

    B.

    2157\frac57​ days

    C.

    1657\frac57​ days

    D.

    1257\frac57​ days

    Correct option is A

    Given:

    A completes the work in 22 days, B in 11 days, and together with C they finish in 5 days.

    Formula Used:
    Work rate =1time.\dfrac{1}{\text{time}}.​​
    Time =1rate.\dfrac{1}{\text{rate}}.​​

    Solution:
    A’s rate =122\dfrac{1}{22}​, B’s rate =111=222.\dfrac{1}{11}=\dfrac{2}{22}.​​
    (A + B) rate =322\dfrac{3}{22}​.
    Given (A + B + C) rate =15.\dfrac{1}{5}.​​

    So, C’s rate =15322=2215110=7110 \dfrac{1}{5}-\dfrac{3}{22}=\dfrac{22-15}{110}=\dfrac{7}{110}​ (work/day).

    C alone takes =17110=1107=\dfrac{1}{\frac{7}{110}}=\dfrac{110}{7} days =1557=15\frac{5}{7}​ days.

    Alternate Method :
    Assume total work =LCM(22,11,5) = 110 units.
    A does 11022=\frac{110}{22}=​5 units/day, B does 11011\frac{110}{11}​=10 units/day.
    Together with C they finish in 5 days =1105=2= \frac{110}5=2​2 units/day.
    Hence C’s rate = 22 - (5 + 10) =7 units/day

    time =1107\frac{110}7 ​days = =1557=15\frac{5}{7}​days.

    Free Tests

    Free
    Must Attempt

    CBT-1 Full Mock Test 1

    languageIcon English
    • pdpQsnIcon100 Questions
    • pdpsheetsIcon100 Marks
    • timerIcon90 Mins
    languageIcon English
    Free
    Must Attempt

    RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

    languageIcon English
    • pdpQsnIcon100 Questions
    • pdpsheetsIcon100 Marks
    • timerIcon90 Mins
    languageIcon English
    Free
    Must Attempt

    CBT-1 General Awareness Section Test 1

    languageIcon English
    • pdpQsnIcon40 Questions
    • pdpsheetsIcon30 Marks
    • timerIcon25 Mins
    languageIcon English

    Similar Questions

    test-prime-package

    Access ‘RRB NTPC UG CBT-1’ Mock Tests with

    • 60000+ Mocks and Previous Year Papers
    • Unlimited Re-Attempts
    • Personalised Report Card
    • 500% Refund on Final Selection
    • Largest Community
    students-icon
    346k+ students have already unlocked exclusive benefits with Test Prime!
    Our Plans
    Monthsup-arrow