Correct option is A
Given:
A can do work in 10 days
B can do the same work in 16 days
C can do the work in 12 days
A,B and C worked in 3 cycles
Formula Used:
Let total work be 1.
Then work done 1 day =Total time to work1
Solution:
A’s one day’s work =101
B’s one day’s work =161
C’s one day’s work =121
Work in all three in one cycle =101+161+121
=24024+15+20=24059
Work done in 3 cycles =3×24059=240177
Work left =1−240177=240240−177=24063
Time taken byB to complete the work =B’s one day workWork left=16124063=521=451days