44 men can do a piece of work in 48 days. The number of men required to complete the same work in 8 days is:
Question

44 men can do a piece of work in 48 days. The number of men required to complete the same work in 8 days is:

A.

260

B.

264

C.

266

D.

261

Correct option is B

Given:

44 men can do a piece of work in 48 days.

Concept used: 

The concept of man-days.

Total work= Number of men× Number of days× EfficiencyTotal \ work = \ Number \ of \ men × \ Number \ of \ days \times \ Efficiency 

Solution:

Total work=44 men×48 days=2112 mandays.Total \ work= 44 \ men \times 48 \ days = 2112 \ man-days. 

Let the required number of men be xxx to complete the same work in 8 days.

The total work remains the same (2112 man-days)

x×8=2112x \times 8 = 2112 

x=21128x = \frac{2112}{8} 

x=264 menx = 264 \ men 

The number of men required to complete the work in 8 days is 264 men.

Free Tests

Free
Must Attempt

CBT-1 Full Mock Test 1

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

CBT-1 General Awareness Section Test 1

languageIcon English
  • pdpQsnIcon40 Questions
  • pdpsheetsIcon30 Marks
  • timerIcon25 Mins
languageIcon English

Similar Questions

test-prime-package

Access ‘RRB JE CBT-I’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
354k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow