    P, Q and R work together to finish a work. P and Q finish 70% of the work while Q and R finish 50% of the work in a specific time period. Who will fin
    Question

    P, Q and R work together to finish a work. P and Q finish 70% of the work while Q and R finish 50% of the work in a specific time period. Who will finish first, if they work alone?

    A.

    Cannot be determined

    B.

    P

    C.

    Q

    D.

    R

    Correct option is B


    Total work = 100% Work done by (P+Q) = 70% Work done by (Q + R) = 50% Work done by (P+Q) and (Q + R) = 70% +50% = 120% Work done by (P+Q+R) = 100% now, (P+Q) + (Q+R) - (P+Q+R) = 120-100 = 20% Q = 20% Work done by P = 70-20 = 50% Work done by R = 50-20 = 30% P works 50% of the total work in same time so P will finish the work first.

    Free Tests

    Free
    Must Attempt

    CBT-1 Full Mock Test 1

    languageIcon English
    • pdpQsnIcon100 Questions
    • pdpsheetsIcon100 Marks
    • timerIcon90 Mins
    languageIcon English
    Free
    Must Attempt

    RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

    languageIcon English
    • pdpQsnIcon100 Questions
    • pdpsheetsIcon100 Marks
    • timerIcon90 Mins
    languageIcon English
    Free
    Must Attempt

    CBT-1 General Awareness Section Test 1

    languageIcon English
    • pdpQsnIcon40 Questions
    • pdpsheetsIcon30 Marks
    • timerIcon25 Mins
    languageIcon English

    Similar Questions

    test-prime-package

    Access ‘RRB JE’ Mock Tests with

    • 60000+ Mocks and Previous Year Papers
    • Unlimited Re-Attempts
    • Personalised Report Card
    • 500% Refund on Final Selection
    • Largest Community
    students-icon
    354k+ students have already unlocked exclusive benefits with Test Prime!
    Our Plans
    Monthsup-arrow