    ‘A’ takes twice as much time ‘B’ to complete a work and ‘C’ does it in the same time as both ‘A’ and ‘B’ together do it. if all three of them work tog
    Question



    ‘A’ takes twice as much time ‘B’ to complete a work and ‘C’ does it in the same time as both ‘A’ and ‘B’ together do it. if all three of them work together and complete the work in 5 days, then the time taken by ‘B’ to complete the work alone is:

    A.

    12 days

    B.

    4 days

    C.

    15 days

    D.

    18 days

    Correct option is C

    Work done = time × efficiency
    A,B and C takes x, x/2, and x/3 days respectively to finish the work.
    According to question

    6x=1/5
    x = 6 × 5
    x = 30
    Time taken by B = 30/2 = 15 days.

    Free Tests

    Free
    Must Attempt

    Basics of Education: Pedagogy, Andragogy, and Hutagogy

    languageIcon English
    • pdpQsnIcon10 Questions
    • pdpsheetsIcon20 Marks
    • timerIcon12 Mins
    languageIcon English
    Free
    Must Attempt

    UGC NET Paper 1 Mock Test 1

    languageIcon English
    • pdpQsnIcon50 Questions
    • pdpsheetsIcon100 Marks
    • timerIcon60 Mins
    languageIcon English
    Free
    Must Attempt

    Basics of Education: Pedagogy, Andragogy, and Hutagogy

    languageIcon English
    • pdpQsnIcon10 Questions
    • pdpsheetsIcon20 Marks
    • timerIcon12 Mins
    languageIcon English

    Similar Questions

    test-prime-package

    Access ‘UGC NET December’ Mock Tests with

    • 60000+ Mocks and Previous Year Papers
    • Unlimited Re-Attempts
    • Personalised Report Card
    • 500% Refund on Final Selection
    • Largest Community
    students-icon
    354k+ students have already unlocked exclusive benefits with Test Prime!
    Our Plans
    Monthsup-arrow