Correct option is B
The peak load refers to the maximum amount of work or activity that can be handled during the most intense or busy periods. It represents the highest demand or load, which typically occurs at certain times of the day, month, or year. In contrast to work standard or time standard, which define expected performance or time allocations, peak load specifically addresses the maximum load or demand at a given point.
Information Booster:
- Peak load is crucial for resource planning, as it helps determine the capacity required to handle the maximum workload or demand. It is often used in fields like manufacturing, transportation, and customer service, where businesses need to prepare for busy periods.
- Work standards and time standards help in maintaining consistent performance and efficiency, but they are not directly related to measuring the highest workload during peak times.
Additional Knowledge (Incorrect Options):
- (a) Work standard: This is incorrect because work standard sets expectations for performance but does not specifically indicate the highest workload during peak times.
- (c) Time standard: This is incorrect because time standard refers to the time allocated for completing tasks, not the workload during peak times.
- (d) More than one of the above: This is incorrect because peak load is the correct term for the highest load of work, not work or time standards.
- (e) None of the above: This is incorrect because peak load is indeed the correct answer.