Correct option is B
PDCA in the theory of Total Quality Management stands for Plan, Do, Check, Act.
The PDCA cycle is a continuous loop of planning, doing, checking (or studying), and acting. It is an iterative four-step management method used for the control and continuous improvement of processes and products.
Information Booster:
1. Plan: Identify an opportunity and plan for change.
2. Do: Implement the change on a small scale.
3. Check: Use data to analyze the results of the change and determine whether it made a difference.
4. Act: If the change was successful, implement it on a wider scale and continuously assess your results. If the change did not work, begin the cycle again.
5. Continuous Improvement: PDCA is a key element of continuous improvement processes.
6. Quality Management: Widely used in quality management and lean manufacturing.
Additional Information:
· Publish, Design, Create, Advertise (a): Incorrect definition of PDCA.
· Prepare, Divide, Control, Ability (c): Incorrect definition of PDCA.
· Punish, Demand, Care, Advise (d): Incorrect definition of PDCA.