arrow
arrow
arrow
Efficiency of B is 37.5 percent less than A whereas efficiency of C is 60 percent less than B. A and C together can do a work in 42 days. Find how lon
Question



Efficiency of B is 37.5 percent less than A whereas efficiency of C is 60 percent less than B. A and C together can do a work in 42 days. Find how long all three will together take to complete the same work?

A.

14 days

B.

21 days

C.

20 days

D.

28 days

Correct option is D

Let the efficiency of A be EAStep 1: Find the efficiencies of B and CEfficiency of B is 37.5% less than A:EB=EA×(137.5100)=EA×0.625Efficiency of C is 60% less than B:EC=EB×(160100)=EB×0.4Substituting EB=EA×0.625:EC=EA×0.625×0.4=EA×0.25Step 2: Work done by A and C in 42 daysDaily work of A and C =EA+EC=EA+0.25EA=1.25EATotal work =42×1.25EA=52.5EAStep 3: Time taken by A, B, and C togetherCombined efficiency: EA+EB+EC=EA+0.625EA+0.25EA=1.875EATime =Total workCombined efficiency=52.5EA1.875EA=52.51.875=28 days\text{Let the efficiency of A be } E_A \\[10pt]\textbf{Step 1: Find the efficiencies of B and C} \\[5pt]\text{Efficiency of B is 37.5\% less than A:} \\E_B = E_A \times \left(1 - \frac{37.5}{100} \right) = E_A \times 0.625 \\[5pt]\text{Efficiency of C is 60\% less than B:} \\E_C = E_B \times \left(1 - \frac{60}{100} \right) = E_B \times 0.4 \\\text{Substituting } E_B = E_A \times 0.625: \\E_C = E_A \times 0.625 \times 0.4 = E_A \times 0.25 \\[10pt]\textbf{Step 2: Work done by A and C in 42 days} \\[5pt]\text{Daily work of A and C } = E_A + E_C = E_A + 0.25E_A = 1.25E_A \\\text{Total work } = 42 \times 1.25E_A = 52.5E_A \\[10pt]\textbf{Step 3: Time taken by A, B, and C together} \\[5pt]\text{Combined efficiency: } E_A + E_B + E_C = E_A + 0.625E_A + 0.25E_A = 1.875E_A \\[5pt]\text{Time } = \frac{\text{Total work}}{\text{Combined efficiency}} = \frac{52.5E_A}{1.875E_A} = \frac{52.5}{1.875} = 28 \text{ days}​​

Free Tests

Free
Must Attempt

DSSSB PRT Full Mock - 01

languageIcon English
  • pdpQsnIcon200 Questions
  • pdpsheetsIcon200 Marks
  • timerIcon120 Mins
languageIcon English
Free
Must Attempt

Educational Psychology & Pedagogy - 01

languageIcon English
  • pdpQsnIcon20 Questions
  • pdpsheetsIcon20 Marks
  • timerIcon15 Mins
languageIcon English
Free
Must Attempt

DSSSB PRT PYP Held on 7th March 2022 Shift 1

languageIcon English
  • pdpQsnIcon200 Questions
  • pdpsheetsIcon200 Marks
  • timerIcon120 Mins
languageIcon English

Similar Questions

test-prime-package

Access ‘DSSSB PGT’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
368k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow