Correct option is D
Let the efficiency of A be EAStep 1: Find the efficiencies of B and CEfficiency of B is 37.5% less than A:EB=EA×(1−10037.5)=EA×0.625Efficiency of C is 60% less than B:EC=EB×(1−10060)=EB×0.4Substituting EB=EA×0.625:EC=EA×0.625×0.4=EA×0.25Step 2: Work done by A and C in 42 daysDaily work of A and C =EA+EC=EA+0.25EA=1.25EATotal work =42×1.25EA=52.5EAStep 3: Time taken by A, B, and C togetherCombined efficiency: EA+EB+EC=EA+0.625EA+0.25EA=1.875EATime =Combined efficiencyTotal work=1.875EA52.5EA=1.87552.5=28 days