Correct option is B
Boiler efficiency =75%,
Electrical Efficiency =50%
Turbine efficiency =80%
Overall Efficiency = Boiler efficiency × turbine efficiency × generator efficiency
=0.75×0.5×0.80
=0.30 =30%
Boiler efficiency =75%,
Electrical Efficiency =50%
Turbine efficiency =80%
Overall Efficiency = Boiler efficiency × turbine efficiency × generator efficiency
=0.75×0.5×0.80
=0.30 =30%