Correct option is C
Given:
A and B together can complete the work in 25 days.
B and C together can complete the work in 36 days.
C and A together can complete the work in 30 days.
A, B, C, and D together can complete the work in 18 days.
Solution:
Work rate of A + B =251
Work rate of B + C =361
Work rate of C + A =301
Work rate of A + B + C + D =181
Now,
(A + B) + (B + C) + (C + A) =251+361+301
2A + 2B + 2C =251+361+301
2(A + B + C) =180072+180050+180060=1800182
A+B+C=21×1800182=180091........(1)
A + B + C + D =181........(2)
Subtracting (1) and (2), we get
D =181−180091
D = 1800100−180091=18009=2001
The rate of work of D is 2001, meaning D can complete the work in 200 days.
Alternate Method:
Efficiency of A + B + C =236+25+30=291=45.5
Efficiency of D = 50 - 45.5 = 4.5
Work done by D =4.5900=200 days