Given:
A and B together can finish a work in 9 days.
B and C together can finish the same work in 12 days.
A and C together can finish the work in 18 days.
Solution:
Work Rate
A + B =
B + C =
A + C =
(A + B) + (B + C) + (A + C) =
2A + 2B + 2C =
2(A + B + C)
A + B + C =
Time taken by A + B + C to complete the work:
Time =
Alternate Method :

Total work = 36 unit.
Efficiency
2(A + B + C) = 4 + 3 + 2 = 9
A + B + C = 4.5 units/day