A and B can do a piece of work in 8 days and 37 days, respectively. The number of days [Correct to one decimal place] required to complete the work if
Question

A and B can do a piece of work in 8 days and 37 days, respectively. The number of days [Correct to one decimal place] required to complete the work if both A and B work together is:

A.

7.7

B.

10.7

C.

7.1

D.

6.5

Correct option is D

Given: 

A can complete a work = 8 days

B can complete same work = 37 days 

Formula Used: 

Total work = Efficiency ×\times time

Solution: 

Total work = LCM (8, 37) = 296 

Efficiency of A = 2968=37\frac{296}{8} = 37 

Efficiency of B = 29637=8\frac{296}{37} = 8 

Combined Efficiency = 8 + 37 = 45 

Time taken by A + B:

29645=6.57 days\frac{296}{45} = 6.57 \ days ​

Free Tests

Free
Must Attempt

CBT-1 Full Mock Test 1

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

RRB NTPC UG Level PYP (Held on 7 Aug 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English

Similar Questions

test-prime-package

Access ‘RRB JE CBT-I’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
368k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow