Which of the following is NOT required for estimating materials in preventive maintenance?
Question

Which of the following is NOT required for estimating materials in preventive maintenance?

A.

Equipment maintenance history

B.

Supplier availability of spare parts

C.

Standard life expectancy of components

D.

Power consumption of the machine

Correct option is D

In preventive maintenance, estimating required materials depends on factors such as maintenance history, availability of spare parts, and expected life of components. These help in planning replacements and avoiding breakdowns.
However, power consumption is not directly related to material estimation. It is more relevant for energy efficiency analysis rather than maintenance planning.
Thus, while the other options are essential for determining spare parts and maintenance needs, power consumption does not influence material estimation.

test-prime-package

Access ‘RRB ALP Fitter’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
444k+ students have already unlocked exclusive benefits with Test Prime!
test-prime-package

Access ‘RRB ALP Fitter’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
444k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow