Correct option is C
The Salal hydro-electric project is located across the Chenab River in the union territory of Jammu and Kashmir, India. This project is one of the major hydropower projects in the region, contributing significantly to the power supply.
Important Key Points:
1. The Salal hydro-electric project has an installed capacity of 690 MW.
2. It was commissioned in two stages, with the first stage completed in 1987 and the second in 1995.
3. The project helps in flood control and provides irrigation benefits.
4. It is managed by the National Hydroelectric Power Corporation (NHPC).
Information Booster:
Jhelum: Known for the Wular Lake, one of the largest freshwater lakes in Asia.
Ravi: Flows through the Indian states of Himachal Pradesh and Punjab.
Beas: Originates in the Himalayas near Rohtang Pass.