Correct option is A
The most common method of pre-stressing used for factory production is the
Long line method.
This method involves casting several precast elements such as beams, slabs, or other structural components in a single long line under pre-stress. This production method is highly efficient for repetitive structures and is widely used due to its capability to produce multiple units under controlled conditions, leading to better quality and uniformity of pre-stressed components.