    Find the correct sequence of the prototype software development model. A. Start B. Develop Prototype C. Deliver to customer D. Quick Desig
    Question



    Find the correct sequence of the prototype software development model.
    A. Start
    B. Develop Prototype
    C. Deliver to customer
    D. Quick Design
    E. Quick Play
    Choose the correct answer from the options given below:

    A.

    A, B, C, D, E

    B.

    A, E, D, B, C

    C.

    A, B, D, E, C

    D.

    A, B, E, D, C

    Correct option is B

    The Prototype Software Development Model follows an iterative and feedback-driven approach. The process begins by gathering initial requirements, followed by developing a quick prototype. The user interacts with the prototype, and feedback is gathered. Then, quick design iterations are performed based on the feedback, and the prototype is improved. This process continues until the final product is refined and delivered to the customer. The correct sequence for the stages is: Start, Quick Play, Quick Design, Develop Prototype, Deliver to Customer.
    Thus, the correct sequence is:
    Answer: (b) A, E, D, B, C
    Information Booster:
    1. Start:
    The process begins with gathering initial requirements and planning the project.
    2. Quick Play: The first prototype is created quickly, and the customer interacts with it to provide feedback.
    3. Quick Design: After feedback, adjustments are made to the design, leading to the creation of a refined prototype.
    4. Develop Prototype: Based on the refined design, the actual prototype is developed and improved iteratively.
    5. Deliver to Customer: The final version of the prototype is delivered to the customer once the system is fully developed and tested.
    Additional Knowledge:
    • Prototype model
    emphasizes frequent user feedback, allowing the product to evolve according to customer needs.
    • Quick Play and Quick Design enable the early detection of issues and address them before the final delivery.
    • The iterative nature of the model allows Develop Prototype to be enhanced until it meets the customer’s requirements.
    • The model can sometimes lead to incomplete requirements being used, as the customer might focus on the prototype’s features rather than the system’s full scope.

    Free Tests

    Free
    Must Attempt

    Basics of Education: Pedagogy, Andragogy, and Hutagogy

    languageIcon English
    • pdpQsnIcon10 Questions
    • pdpsheetsIcon20 Marks
    • timerIcon12 Mins
    languageIcon English
    Free
    Must Attempt

    UGC NET Paper 1 Mock Test 1

    languageIcon English
    • pdpQsnIcon50 Questions
    • pdpsheetsIcon100 Marks
    • timerIcon60 Mins
    languageIcon English
    Free
    Must Attempt

    Basics of Education: Pedagogy, Andragogy, and Hutagogy

    languageIcon English
    • pdpQsnIcon10 Questions
    • pdpsheetsIcon20 Marks
    • timerIcon12 Mins
    languageIcon English

    Similar Questions

    test-prime-package

    Access ‘UGC NET Computer Science’ Mock Tests with

    • 60000+ Mocks and Previous Year Papers
    • Unlimited Re-Attempts
    • Personalised Report Card
    • 500% Refund on Final Selection
    • Largest Community
    students-icon
    368k+ students have already unlocked exclusive benefits with Test Prime!
    Our Plans
    Monthsup-arrow