Correct option is C
The correct answer is: (c) 1 and 2 only
Explanation:
• Statement 1 is correct – The Kudankulam Nuclear Power Plant in Tamil Nadu, with a planned capacity of 6000 MW, is the largest nuclear power station in India in terms of installed capacity.
• Statement 2 is correct – The Solar Energy Corporation of India (SECI) is indeed the implementing agency for National Solar Mission, and it plays a key role in promoting and developing solar energy.
• Statement 3 is incorrect – India’s target for renewable energy by 2022 under its commitment to the Paris Agreement was 175 GW, not 275 GW. The 275 GW target is a future expanded goal (for 2027 and beyond).
Information Booster:
• Kudankulam Nuclear Power Plant is developed in collaboration with Russia (Rosatom).
• SECI is a PSU under the Ministry of New and Renewable Energy (MNRE).
• India’s renewable energy target by 2030 is set at 500 GW of non-fossil fuel capacity.
• National Solar Mission is part of the National Action Plan on Climate Change (NAPCC).
• SECI also works on solar park development and solar-wind hybrid projects.