arrow
arrow
arrow
Arrange the following sites in chronological order based on the stylistic development of Buddhist sculpture: a) Mathura b) Bharhut c) Sanchi Stu
Question

Arrange the following sites in chronological order based on the stylistic development of Buddhist sculpture:
a) Mathura
b) Bharhut
c) Sanchi Stupa

A.

b-c-a

B.

c-a-b

C.

c-b-a

D.

a-c-b

Correct option is A

The correct answer is (a) b-c-a.
Bharhut represents the earliest phase of Buddhist sculpture, dating to the 2nd century BCE (Shunga period), marked by aniconic representations of the Buddha.
Sanchi Stupa developed mainly during the late 2nd–1st century BCE, showing refined narrative reliefs and symbolic depictions.
Mathura flourished later, from the 1st century BCE to 2nd century CE, especially under the Kushanas, introducing anthropomorphic images of the Buddha.
Information Booster:
• Bharhut and Sanchi belong to the aniconic phase of Buddhist art.
• Mathura marks the iconic phase with human Buddha figures.
Additional Knowledge:
• Mathura used red sandstone and strong indigenous styles.
• Along with Gandhara, Mathura became a major Buddhist art centre during the Kushana period (1st–3rd century CE).

Free Tests

Free
Must Attempt

SSC CGL T-I Similar Paper (Held on 12 Sep 2025 S2)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon200 Marks
  • timerIcon60 Mins
languageIcon English
Free
Must Attempt

SSC CGL T-I GA Section Test 01

languageIcon English
  • pdpQsnIcon25 Questions
  • pdpsheetsIcon50 Marks
  • timerIcon15 Mins
languageIcon English
Free
Must Attempt

SSC CGL T-I Full Mock Test 1 (Exam Level)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon200 Marks
  • timerIcon60 Mins
languageIcon English
test-prime-package

Access ‘SSC CGL Tier I’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
383k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow