Correct option is C
A’s work rate: If A finishes 52 of the job in 10 days, then A does102/5=251 of the job per day. Thus, A alone can complete the entire job in 25 days.
B’s work rate: If B finishes 21 of the job in 10 days, then B does 101/2=201 of the job per day. B alone can complete the entire job in 20 days.
Together for 5 days: Their combined daily rate is 251+201=1004+1005=1009.
In 5 days, they complete 1009×5=10045=209.
Remaining work: 1−209=2011.
B alone finishes: 2011 divided by B’s rate (201) is 2011÷201=11