Correct option is C
Given:
Work done by A + B + C = 5 days
Work done by B + C + D = 10 days
Work done by C + D + A = 15 days
Work done by D + A + B = 30 days
Solution:
Work rates :
A + B + C =
B + C + D =
C + D + A =
D + A + B =
Adding all above equations,
3(A + B + C + D) =
3(A + B + C + D)=
3(A + B + C + D) =
(A + B + C + D) =
Now , working together all four can complete the work in :