Correct option is A
The project was approved on 18 October 2023.
It was approved by the Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi.
It is to be implemented by FY 2029-30 at an estimated cost of ₹20,773.70 crore.
• The Green Energy Corridor Phase-II in Ladakh will evacuate 13 GW of renewable energy to the national grid.
• The transmission system will run approximately 713 km connecting Pang (Ladakh) to Kaithal (Haryana).
• The project will improve energy security, support climate goals, and promote infrastructure in remote regions.
• The Government of India targets 500 GW of non-fossil capacity by 2030 under the Paris Agreement commitments.
• The system will include HVDC transmission lines, substations, and battery energy storage systems (BESS).