Which of the following pairs of thermal power plants and their locations is NOT correct?
Question

Which of the following pairs of thermal power plants and their locations is NOT correct?

A.

Korba - Chhattisgarh

B.

Neyveli - Tamil Nadu

C.

Talcher - Assam

D.

Panki - Uttar Pradesh

Correct option is C

The correct answer is (c) Talcher - Assam.

Talcher is located in Odisha, not in Assam. The Talcher Thermal Power Station is in Odisha, which is known for its coal reserves and thermal power generation, not in Assam.

Information Booster

  • Thermal Power Plants
    • These are power plants that use heat energy to produce electricity, typically through the combustion of coal, natural gas, or oil.
    • Coal-based thermal power plants are the most common in India. Talcher, Korba, and Neyveli are some examples of such plants.
    • They play a critical role in meeting India's energy demand and are a major part of the electricity generation mix.

Additional Knowledge

  • Korba - Chhattisgarh
    • Korba is located in Chhattisgarh and houses one of India’s largest coal-based thermal power plants. It contributes a substantial amount of electricity to the national grid.
  • Neyveli - Tamil Nadu
    • Neyveli in Tamil Nadu is home to lignite-based power plants, which use lignite coal for power generation. It has a significant role in the power sector of South India.
  • Panki - Uttar Pradesh
    • The Panki Thermal Power Station in Uttar Pradesh is a coal-fired power plant that supplies electricity to the state and surrounding regions.

Free Tests

Free
Must Attempt

CBT-1 Full Mock Test 1

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

RRB NTPC Graduate Level PYP (Held on 5 Jun 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

CBT-1 General Awareness Section Test 1

languageIcon English
  • pdpQsnIcon40 Questions
  • pdpsheetsIcon30 Marks
  • timerIcon25 Mins
languageIcon English
test-prime-package

Access ‘RRB NTPC’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
354k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow