arrow
arrow
arrow
Where did the subsidiary of Adani Hybrid Energy setup India’s first wind-solar hybrid power plant?
Question

Where did the subsidiary of Adani Hybrid Energy setup India’s first wind-solar hybrid power plant?

A.

Raipur

B.

Hyderabad

C.

Delhi

D.

Jaisalmer

Correct option is D

The correct answer is (d) Jaisalmer.
· The subsidiary of Adani Hybrid Energy set up India’s first wind-solar hybrid power plant in Jaisalmer. This plant combines both wind and solar energy to generate power, promoting renewable energy sources and reducing dependency on traditional fossil fuels.
· Jaisalmer, with its favorable climatic conditions, is an ideal location for such hybrid energy projects.
Important Key Points:
· First wind-solar hybrid power plant: Jaisalmer.
· Set up by: Adani Hybrid Energy.
· Promotes: Renewable energy sources.
· Reduces dependency on fossil fuels.
· Favorable climatic conditions in Jaisalmer.

Free Tests

Free
Must Attempt

Rajasthan GK Subject Test :03

languageIcon English
  • pdpQsnIcon10 Questions
  • pdpsheetsIcon10 Marks
  • timerIcon8 Mins
languageIcon English
Free
Must Attempt

RRB NTPC UG Level PYP (Held on 7 Aug 2025 S1)

languageIcon English
  • pdpQsnIcon100 Questions
  • pdpsheetsIcon100 Marks
  • timerIcon90 Mins
languageIcon English
Free
Must Attempt

General Awareness Subject Test :01

languageIcon English
  • pdpQsnIcon10 Questions
  • pdpsheetsIcon10 Marks
  • timerIcon8 Mins
languageIcon English
test-prime-package

Access ‘Rajasthan CET Graduate Level’ Mock Tests with

  • 60000+ Mocks and Previous Year Papers
  • Unlimited Re-Attempts
  • Personalised Report Card
  • 500% Refund on Final Selection
  • Largest Community
students-icon
354k+ students have already unlocked exclusive benefits with Test Prime!
Our Plans
Monthsup-arrow