    The retained wall in continuation of abutments both upstream and downstream is called as-
    Question

    The retained wall in continuation of abutments both upstream and downstream is called as-

    A.

    Border wall

    B.

    Flank wall

    C.

    Base wall

    D.

    Parapet wall

    Correct option is B


    A flank wall is the retained wall in continuation of abutments both upstream and downstream in a structure such as a bridge or dam. These walls provide support to the embankment and help retain the earth on either side of the structure, ensuring stability and preventing erosion. Flank walls are commonly used in bridge construction and water-retaining structures.

    test-prime-package

    Access ‘RRB JE Civil Engineering’ Mock Tests with

    • 60000+ Mocks and Previous Year Papers
    • Unlimited Re-Attempts
    • Personalised Report Card
    • 500% Refund on Final Selection
    • Largest Community
    students-icon
    354k+ students have already unlocked exclusive benefits with Test Prime!
    test-prime-package

    Access ‘RRB JE Civil Engineering’ Mock Tests with

    • 60000+ Mocks and Previous Year Papers
    • Unlimited Re-Attempts
    • Personalised Report Card
    • 500% Refund on Final Selection
    • Largest Community
    students-icon
    354k+ students have already unlocked exclusive benefits with Test Prime!
    Our Plans
    Monthsup-arrow