Correct option is D
The maximum permissible leakage current in any installation is 1/5000 of full load current.
The maximum permissible leakage current in any installation is 1/5000 of full load current.
In regard to estimation and costing of public lighting, which of the following factors is NOT a fundamental criterion for the quality of public lighting?
Which of the following triggers the failure of successive parts?
Chargeable expenses are occasionally also termed as______.
In the estimation and costing of public installations, which of the following factors is required, especially in long stretches of the road and even more on complicated intersections?
In internal wiring estimation, if the connected load is 2 kW and the supply voltage is 240 V, then the maximum load current will be __________.
As per Indian Electricity rule, the recommended operating voltage for a long transmission line is _______.
When the soil moisture content reduces below __________, the resistivity of the earth increases sharply.