Correct option is A
Given:
Pipe X is 7 times faster than pipe Y
Time taken by X and Y together = 49 minutes
Formula Used:
Let the time taken by pipe Y alone = y minutes
Then pipe X alone will take minutes
Combined rate of work = sum of individual efficiency
Efficiency (Work Done Per Minute) =
Solution:
Combined Efficiency =
minutes
Time taken by pipe Y alone = 392 minutes
Thus, the correct option is (a) 392 minutes
Alternate:
=
Total work = (7 + 1) 49
= 8 49
= 392
Time taken by pipe Y alone =
= 392 minutes.