Correct option is C
To calculate the current, we can use the formula:I=VPWhere:∙P=2kW=2000W (Power)∙V=240V (Voltage)Now, applying the values:I=2402000=8.33A
In internal wiring estimation, if the connected load is 2 kW and the supply voltage is 240 V, then the maximum load current will be __________.
Chargeable expenses are occasionally also termed as______.
In regard to estimation and costing of public lighting, which of the following factors is NOT a fundamental criterion for the quality of public lighting?
In internal wiring estimation, if the connected load is 2 kW and the supply voltage is 240 V, then the maximum load current will be __________.
In the estimation and costing of public installations, which of the following factors is required, especially in long stretches of the road and even more on complicated intersections?
Which of the following triggers the failure of successive parts?
As per Indian Electricity rule, the recommended operating voltage for a long transmission line is _______.
Chargeable expenses are occasionally also termed as______.
Chargeable expenses are occasionally also termed as______.
In regard to estimation and costing of public lighting, which of the following factors is NOT a fundamental criterion for the quality of public lighting?
In internal wiring estimation, if the connected load is 2 kW and the supply voltage is 240 V, then the maximum load current will be __________.
In the estimation and costing of public installations, which of the following factors is required, especially in long stretches of the road and even more on complicated intersections?
Which of the following triggers the failure of successive parts?
As per Indian Electricity rule, the recommended operating voltage for a long transmission line is _______.
Chargeable expenses are occasionally also termed as______.