Correct option is C
- The Rourkela Steel Plant was set-up in 1959 in the Sundargarh district of Odisha in collaboration with Germany.
- The plant receives coal from Jharia (Jharkhand) and iron-ore from Sundargarh and Kendujhar.
- The Hirakud Project supplies power for the electric furnaces and water is obtained from the Sankh and the Koel rivers.