Correct option is D
The correct answer is (d) 22
Explanation:
- The government has targeted the construction of 22 new greenfield expressways under the Bharatmala Pariyojana by FY 2024-25.
- These are access-controlled expressways, constructed on new alignments to enhance connectivity and reduce logistics costs.
- Major corridors include the Delhi–Mumbai, Delhi–Amritsar–Katra, and Bengaluru–Chennai Expressways.
- These projects aim to facilitate faster cargo movement, decongest existing highways, and boost regional development.
- As of now, construction work is underway on several of these expressways, showcasing tangible progress.
Information Booster:
- A total of 25 greenfield expressways are reportedly under various stages of construction.
- India's expressway network has grown from 93 km in 2013 to over 5,100 km in 2025, reflecting rapid infrastructure expansion.
- The Ministry of Road Transport and Highways is leading this transformation under the National Infrastructure Pipeline.
- Key schemes include:
- Bharatmala Phase-I
- National Logistics Policy
- PM Gati Shakti Master Plan
- Construction pace reached up to 34 km/day in FY 2023-24, demonstrating efficiency and scale.