Correct option is A
Let the total work be LCM of 72, 120, and 90 = 720 units (for easier calculation).
Let’s define work rates:
Arun + Barun do 720 units in 72 days → their combined rate = 720 ÷ 72 = 10 units/day
Barun + Gitu do it in 120 days → rate = 720 ÷ 120 = 6 units/day
Arun + Gitu do it in 90 days → rate = 720 ÷ 90 = 8 units/day
Now, add the first and third equations, then subtract the second:
(Arun + Barun) + (Arun + Gitu) = 10 + 8 = 18
Subtract (Barun + Gitu) = 6
So:
2Arun = 18 - 6 = 12 → Arun’s rate = 6 units/day
Now, total work = 720 units
Time = 720 ÷ 6 = 120 days
Answer: (A) 120 days