Correct option is A
Given:
Work done by A in 1 day =
Work done by B in 1 day =
Work done by B in 1 day =
Step 1: Work done by A in 3 days = 3 × = 1/4
Remaining work = 1 − =
Remaining work = 1 − =
Work done in 1 day by A + B together = +
LCM of 12 and 18 = 36
So, + =
LCM of 12 and 18 = 36
So, + =
Time required to finish remaining 3/4 work = (3/4) ÷ (5/36)
= ×
= 108/20 = 5.4 days
= ×
= 108/20 = 5.4 days
Total days = 3 (already done by A) + 5.4 = 8.4 days
Thus, correct option is (a).